Actions for Coyote Springs Cogeneration Project, Morrow County, Oregon [electronic resource] : Draft Environmental Impact Statement
Coyote Springs Cogeneration Project, Morrow County, Oregon [electronic resource] : Draft Environmental Impact Statement
- Published
- Washington, D.C. : United States. Dept. of Energy, 1994.
Oak Ridge, Tenn. : Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy. - Physical Description
- 266 pages : digital, PDF file
- Additional Creators
- United States. Bonneville Power Administration, United States. Department of Energy, and United States. Department of Energy. Office of Scientific and Technical Information
Access Online
- Restrictions on Access
- Free-to-read Unrestricted online access
- Summary
- BPA is considering whether to transfer (wheel) electrical power from a proposed privately-owned, combustion-turbine electrical generation plant in Oregon. The plant would be fired by natural gas and would use combined-cycle technology to generate up to 440 average megawatts (aMW) of energy. The plant would be developed, owned, and operated by Portland General Electric Company (PGE). The project would be built in eastern Oregon, just east of the City of Boardman in Morrow County. The proposed plant would be built on a site within the Port of Morrow Industrial Park. The proposed use for the site is consistent with the County land use plan. Building the transmission line needed to interconnect the power plant to BPA`s transmission system would require a variance from Morrow County. BPA would transfer power from the plant to its McNary-Slatt 500-kV transmission line. PGE would pay BPA for wheeling services. Key environmental concerns identified in the scoping process and evaluated in the draft Environmental Impact Statement (DEIS) include these potential impacts: (1) air quality impacts, such as emissions and their contributions to the {open_quotes}greenhouse{close_quotes} effect; (2) health and safety impacts, such as effects of electric and magnetic fields, (3) noise impacts, (4) farmland impacts, (5) water vapor impacts to transportation, (6) economic development and employment impacts, (7) visual impacts, (8) consistency with local comprehensive plans, and (9) water quality and supply impacts, such as the amount of wastewater discharged, and the source and amount of water required to operate the plant. These and other issues are discussed in the DEIS. The proposed project includes features designed to reduce environmental impacts. Based on studies completed for the DEIS, adverse environmental impacts associated with the proposed project were identified, and no evidence emerged to suggest that the proposed action is controversial.
- Report Numbers
- E 1.99:doe/bp-2256
E 1.99: doe/eis-0201
doe/eis-0201
doe/bp-2256 - Subject(s)
- Other Subject(s)
- Note
- Published through SciTech Connect.
01/01/1994.
"doe/bp-2256"
" doe/eis-0201"
"DE94007591"
"NONE"
United States. Bonneville Power Administ. - Type of Report and Period Covered Note
- Topical; 01/01/1994 - 01/01/1994
View MARC record | catkey: 14758445