System Requirements Document for the Molten Salt Reactor Experiment [electronic resource].
Published
Washington, D.C. : United States. Dept. of Energy, 2000. Oak Ridge, Tenn. : Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy.
The purpose of the conversion process is to convert the ²³³U fluoride compounds that are being extracted from the Molten Salt Reactor Experiment (MSRE) equipment to a stable oxide for long-term storage at Bldg. 3019.