Life cycle costs for the domestic reactor-based plutonium disposition option [electronic resource].
- Published:
- Washington, D.C. : United States. Dept. of Energy. Office of Fissile Materials Disposition, 1999.
Oak Ridge, Tenn. : Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy. - Physical Description:
- vp : digital, PDF file
- Additional Creators:
- Oak Ridge National Laboratory, United States. Department of Energy. Office of Fissile Materials Disposition, and United States. Department of Energy. Office of Scientific and Technical Information
Access Online
- Restrictions on Access:
- Free-to-read Unrestricted online access
- Summary:
- Projected constant dollar life cycle cost (LCC) estimates are presented for the domestic reactor-based plutonium disposition program being managed by the US Department of Energy Office of Fissile Materials Disposition (DOE/MD). The scope of the LCC estimate includes: design, construction, licensing, operation, and deactivation of a mixed-oxide (MOX) fuel fabrication facility (FFF) that will be used to purify and convert weapons-derived plutonium oxides to MOX fuel pellets and fabricate MOX fuel bundles for use in commercial pressurized-water reactors (PWRs); fuel qualification activities and modification of facilities required for manufacture of lead assemblies that will be used to qualify and license this MOX fuel; and modification, licensing, and operation of commercial PWRs to allow irradiation of a partial core of MOX fuel in combination with low-enriched uranium fuel. The baseline cost elements used for this document are the same as those used for examination of the preferred sites described in the site-specific final environmental impact statement and in the DOE Record of Decision that will follow in late 1999. Cost data are separated by facilities, government accounting categories, contract phases, and expenditures anticipated by the various organizations who will participate in the program over a 20-year period. Total LCCs to DOE/MD are projected at approximately $1.4 billion for a 33-MT plutonium disposition mission.
- Report Numbers:
- E 1.99:ornl/tm--1999/257
ornl/tm--1999/257 - Subject(s):
- Other Subject(s):
- Note:
- Published through SciTech Connect.
10/01/1999.
"ornl/tm--1999/257"
Williams, K.A. - Type of Report and Period Covered Note:
- Topical;
- Funding Information:
- AC05-96OR22464
View MARC record | catkey: 14800824