Actions for Optimization of costs versus radiation exposures in decommissioning [electronic resource].
Optimization of costs versus radiation exposures in decommissioning [electronic resource].
- Published
- Columbus, Ohio : Battelle Memorial Institute, 1979.
Oak Ridge, Tenn. : Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy. - Physical Description
- Pages: 17 : digital, PDF file
- Additional Creators
- Battelle Memorial Institute and United States. Department of Energy. Office of Scientific and Technical Information
Access Online
- Restrictions on Access
- Free-to-read Unrestricted online access
- Summary
- The estimated worth of decommissioning optimization planning during each phase of the reactor's life cycle is dependent on many variables. The major variables are tabulated and relatively ranked. For each phase, optimization qualitative values (i.e., cost, safety, maintainability, ALARA, and decommissioning considerations) are estimated and ranked according to their short-term and long-term potential benefits. These estimates depend on the quality of the input data, interpretation of that data, and engineering judgment. Once identified and ranked, these considerations form an integral part of the information data base from which estimates, decisions, and alternatives are derived. The optimization of costs and the amount of occupational radiation exposure reductions are strongly interrelated during decommissioning. Realizing that building the necessary infrastructure for decommissioning will take time is an important first step in any decommissioning plan. In addition, the following conclusions are established to achieve optimization of costs and reduced occupational radiation exposures: the assignment of cost versus man-rem is item-specific and sensitive to the expertise of many interrelated disciplines; a commitment to long-term decommissioning planning by management will provide the conditions needed to achieve optimization; and, to be most effective, costs and exposure reduction are sensitive to the nearness of the decommissioning operation. For a new plant, it is best to start at the beginning of the cycle, update continually, consider innovations, and realize full potential and benefits of this concept. For an older plant, the life cycle methodology permits a comprehensive review of the plant history and the formulation of an orderly decommissioning program based on planning, organization, and effort.
- Report Numbers
- E 1.99:pnl-sa-8017
E 1.99: conf-790923-12
conf-790923-12
pnl-sa-8017 - Subject(s)
- Other Subject(s)
- Note
- Published through SciTech Connect.
01/01/1979.
"pnl-sa-8017"
" conf-790923-12"
Decontamination and decommissioning of nuclear facilities conference, Sun Valley, ID, USA, 16 Sep 1979.
Konzek, G.J. - Funding Information
- AC06-76RL01830
View MARC record | catkey: 14801698