Actions for Confirmation of the calculated breeding ratio for CRBRP [electronic resource].
Confirmation of the calculated breeding ratio for CRBRP [electronic resource].
- Published
- Argonne, Ill. : Argonne National Laboratory, 1983.
Oak Ridge, Tenn. : Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy. - Physical Description
- Pages: 6 : digital, PDF file
- Additional Creators
- Argonne National Laboratory and United States. Department of Energy. Office of Scientific and Technical Information
Access Online
- Restrictions on Access
- Free-to-read Unrestricted online access
- Summary
- A breeding ratio of at least 1.2 was a design goal for CRBRP. The value for the initial core (using plutonium with 11% /sup 240/Pu) calculated with ENDF/B-IV data is 1.27. Engineering mock-up studies for CRBRP were made in ZPPR-11. Analysis of ZPPR-11 using ENDF/B-IV data showed consistent underprediction of K/sub eff/ by about 1.5% and overpredictions of the /sup 238/U capture to /sup 239/Pu fission ratio (C8/F9) between 5% and 8%. These results are typical for all LMFBR critical assemblies at ANL. The following approach was used to determine the breeding ratio: sensitivity analysis of a range of fast reactor benchmarks and a fit to the experimental data by data adjustment; tests of the adjusted data against experiments in ZPPR-11; calculations for CRBRP with ENDF/B-IV data and the adjusted data to predict the breeding ratio bias; and estimates of k/sub eff/ and breeding ratio uncertainties using data sensitivities for CRBRP.
- Report Numbers
- E 1.99:conf-831047-48
conf-831047-48 - Subject(s)
- Other Subject(s)
- Note
- Published through SciTech Connect.
01/01/1983.
"conf-831047-48"
"DE83014693"
American Nuclear Society winter meeting, San Francisco, CA, USA, 30 Oct 1983.
Collins, P.J.; Turski, R.; Liaw, J. - Funding Information
- W-31-109-ENG-38
View MARC record | catkey: 14802225