Preparation of Flight Operations and IWS Integration of the CELIAS Experiment on the SOHO Spacecraft
- Author
- Ipavich, Fred
- Published
- Mar. 07, 1996.
- Physical Description
- 1 electronic document
Online Version
- hdl.handle.net , Connect to this object online.
- Restrictions on Access
- Unclassified, Unlimited, Publicly available.
Free-to-read Unrestricted online access - Summary
- During this reporting time period, the following activities took place: (1) generation of several versions of the CELIAS (STOF/SEM/CTOF/MTOF/DPU) commissioning timeline for the first 180 days after launch; (2) identification of several problems with the CELIAS portion of the Project Data Base (PDB); (3) attendance of the Science Operations Working Group (SOWG) Meetings (November 1994, February 1995, May 1995) and Flight Operations Review Meeting (July 1995); (4) participation in Flight Operation Simulations SIM 1 (November 14-18, 1994), SIM 2 (May 1-4, 1995) and SIM3 (August 7-11, 1995); and (5) participation in the Ground System Compatibility Test Rehearsal (April 24-28) 1995), GSCT #2 (May 30-June 14, 1995), GSCT #3 (September 12-22 1995), and GSCT #4b (October 30-November 5, 1995).
- Other Subject(s)
- Collection
- NASA Technical Reports Server (NTRS) Collection.
- Note
- Document ID: 19960016754.
Accession ID: 96N22329.
NASA-CR-200663.
NAS 1.26:200663. - Terms of Use and Reproduction
- No Copyright.
View MARC record | catkey: 15651162