The activities of the ATS-6 spacecraft for the checkout period of approximately four weeks beginning May 30, 1974 are described, along with the results of a performance evaluation of its subsystems and components. The following specific items are discussed: (1) subsystem requirements/specifications and in-orbit performance summary; (2) flight chronology; (3) spacecraft description; (4) structural/deployment subsystems; (5) electrical power subsystem; (6) thermal control subsystem; (7) telemetry and command subsystems; (8) attitude control subsystem; (9) spacecraft propulsion subsystem; (10) communication subsystem; and (12) experiment subsystem.