Planning Under Continuous Time and Resource Uncertainty : A Challenge for AI.
- Author:
- Dearden, Richard
- Published:
- [2002].
- Physical Description:
- 1 electronic document
- Additional Creators:
- Clancy, Daniel
Smith, David
Meuleau, Nicolas
Washington, Rich
Bresina, John - Access Online:
- hdl.handle.net
- Restrictions on Access:
- Unclassified, Unlimited, Publicly available.
- Summary:
- There has been considerable work in Al on decision-theoretic planning and planning under uncertainty. Unfortunately, all of this work suffers from one or more of the following limitations: 1) it relies on very simple models of actions and time, 2) it assumes that uncertainty is manifested in discrete action outcomes, and 3) it is only practical for very small problems. For many real world problems, these assumptions fail to hold. A case in point is planning the activities for a Mars rover. For this domain none of the above assumptions are valid: 1) actions can be concurrent and have differing durations, 2) there is uncertainty concerning action durations and consumption of continuous resources like power, and 3) typical daily plans involve on the order of a hundred actions. We describe the rover problem, discuss previous work on planning under uncertainty, and present a detailed. but very small, example illustrating some of the difficulties of finding good plans.
- Collection:
- NASA Technical Reports Server (NTRS) Collection.
- Note:
- Document ID: 20020052441.
National Conference on AI (AIAA); 28 Jul. - 1 Aug. 2002; Edmonton, Alberta; Canada. - Terms of Use and Reproduction:
- No Copyright.
- Access Online:
- hdl.handle.net
View MARC record | catkey: 15968263