NASA Experience with CMM and CMMI
- Author:
- Crumbley, Tim
- Published:
- November 2010.
- Physical Description:
- 1 electronic document
- Additional Creators:
- Kelly, John C.
- Access Online:
- hdl.handle.net
- Restrictions on Access:
- Unclassified, Unlimited, Publicly available.
- Summary:
- This slide presentation reviews the experience NASA has had in using Capability Maturity Model (CMM) and Capability Maturity Model Integration (CMMI). In particular this presentation reviews the agency's experience within the software engineering discipline and the lessons learned and key impacts from using CMMI.
- Collection:
- NASA Technical Reports Server (NTRS) Collection.
- Note:
- Document ID: 20110009885.
M11-0090.
NASA Project Management Challenge 2011; 9-10 Feb. 2011; Long Beach, CA; United States.
10th Annual CMMI Technology Conference and User Group; 15-18 Nov. 2010; Denver, CO; United States. - Terms of Use and Reproduction:
- No Copyright.
- Access Online:
- hdl.handle.net
View MARC record | catkey: 15991442