LEAP FOREWORD IN PROGRESS ON THE PROJECT FOR DISTRICTING IN T'AO HO -- ACCOMPLISHMENT OF 1958-1959 WINTER AND SPRING WATER CONSERVATION CONSTRUCTION GOALS DISCUSSED -- REVISION OF THE KANG-NAN [HOPEH] RESERVOIR DESIGN by Hsu Ssu-fu, K'o Li-tan -- INCREASE USE OF LOCAL MATERIALS FOR DAMS by Ch'en Shih-yuan -- STRIVE TO PRODUCE CONDITIONS PREVAILING SOUTH OF THE YANG-TZE RIVER IN THE AREA NORTH OF THE HUAI HO by Anhwei Province Water Conservation and Hydroelectric Power Department -- SUGGESTIONS ON THE UTILIZATION OF WATER CAPACITY OF RESERVOIRS -- CHANGES IN THE UTILIZATION OF THE TA-HUO-FANG (LIAONING) RESERVOIR PROVIDE FOR LARGER IRRIGATION AREA by Tuan I-shih -- INFORMATION ON KANSU PROVINCE by Hsu K'ai -- A NEW WATER RESERVOIR BUILT IN 120 HOURS by Hsin Ch'i-ch'ang -- CONSTRUCTION OF PILED BOULDER STONE DAMS (POPULAR SELECTION OF DAM TYPES AND UTILIZATION OF PILED BOULDERS FOR DAM MATERIALS) by Hsin-hsiang.
Electronic reproduction. Chester, Vt. : NewsBank, inc., 2013. Available via the World Wide Web. Access restricted to Readex Joint Publications Research Service (JPRS) Reports subscribers.
Terms of Use and Reproduction
Copyright 2013 by NewsBank, inc. All rights reserved.