Controlled Environmental Agriculture and Energy Project [electronic resource].
- Published
- Washington, D.C. : United States. Dept. of Energy. Office of Energy Efficiency and Renewable Energy, 2012.
Oak Ridge, Tenn. : Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy - Physical Description
- 6 pages : digital, PDF file
- Additional Creators
- United States. Department of Energy. Office of Energy Efficiency and Renewable Energy and United States. Department of Energy. Office of Scientific and Technical Information
Access Online
- Restrictions on Access
- Free-to-read Unrestricted online access
- Summary
- Task A: Heating Plant - To design/build a Heating Plant Building with associated heating components for heating the greenhouse and to house the biomass gasification system. The subtasks for this task was and Engineering Design, Procurement and Construction activities. Overall milestones for this task were one construction permit, a code review and stamped drawings, engineered building vendor supplied sealed drawings, and the actual erection of a 1250 sq.ft. building. Task B: Heating System - The activities for this task included the procurement of the heating boilers and all ancillary components. This also included the installation of all heating system components in the new building plus the existing greenhouse structure. The milestone for this task was for the ability to heat 2500 gallons of water to 80 degrees F. Task C: Organic Matter Automated Hopper - The activities involved in this task involved design/fabrication of an automated hopper to feed the biomass gasification system. We need to procure materials and the automated motion components, have the system installed and factory acceptance test of the system. The milestone is to be able to feed wood chips at a rate of 20 Kg/Hr. Task D: Imbert Gasification System - The activities involved in this include the design/build of the gasifier with all accompany ductwork, cyclones and feeding system. Also there is a modification to the scrubber assembly with an automated ash removal system. Lastly a modification to the exhaust/flair system is made to capture heat from this component. Milestone for this task was to be able to produce 15 CFM of SynGas. Task E: Generator Powered by SynGas - Procure two 20kW 4 pole generator heads for installation on the gasifier system. Modification of the fuel plenum manifold with adjustment to the fuel curves for maximum power and load points. Milestone for this task is the ability to run two fuels, either SynGas or propane. This continues with the following tasks: Controls Heating System; Controls Generators 20kW; Controls Gasification; Algae System; and Final Evaluation/Operation.
- Report Numbers
- E 1.99:doe-morrisville--2615
doe-morrisville--2615 - Subject(s)
- Note
- Published through SciTech Connect.
07/27/2012.
"doe-morrisville--2615"
Chris Campbell.
Morrisville State College, NY (United States) - Type of Report and Period Covered Note
- Final;
- Funding Information
- EE0002615
View MARC record | catkey: 23493542