Analysis of the EE-3A Temperature Logs Following the Expt. 2064 Pre-Pump [electronic resource].
Published
Washington, D.C. : United States. Dept. of Energy, 1985. Oak Ridge, Tenn. : Distributed by the Office of Scientific and Technical Information, U.S. Dept. of Energy
From Nov. 25 to Dec. 1, 1985, 189,700 gallons of Fenton Hill well water were injected into EE-2 using the big Kobe pump (at 34 gpm). Temperature logs were run in EE-3A on Dec. 3 and 5 to assess the results of this reservoir reinflation.