Cougar Dam Hydroelectric Project [microform] : hearings before the United States House Committee on Public Works, Subcommittee on Flood Control, Eighty-Third Congress, second session, on Mar. 19, Apr. 28, 1954
- Corporate Author
- United States. Congress. House. Committee on Public Works. Subcommittee on Flood Control
- Published
- Washington : U.S. G.P.O., 1954.
- Physical Description
- iii, 96 pages ; cm.
- Summary
- Committee Serial No. 83-15. Considers legislation to modify the general plan for additional hydroelectric power development of the Columbia River Basin and to construct, operate, and maintain the Cougar Dam and Reservoir on the south fork of McKenzie River, Oreg., with participation for power by Eugene, Oreg.
Considers (83) H.R. 4541, (83) H.R. 7815. - Report Numbers
- Y 4.P 96/11:83/15
- Subject(s)
- Note
- Microfiche Note: Page 1 is missing.
Record is based on bibliographic data in CIS US Congressional Committee Hearings Index. Reuse except for individual research requires license from Congressional Information Service, Inc. - Reproduction Note
- Microfiche. [Westport, Conn.] : Greenwood Press, 1973. 11 x 15 cm.
- Reviewed/Cited In
- Indexed in CIS US Congressional Committee Hearings Index Part VI
View MARC record | catkey: 2503852