The station remained shutdown duriag the entire month of Dec. 1958, while repair work continued on the No. 1 main turbine-generator and its moisture separator. Chemical conditions for both the reactor plant and turbine plant are discussed. Work by the health physics group is described. Maintenance, testing, and training are summarized. (For preceding period see AEC U-3986.) (W.D.M.)