BS>Startup instrumentation for the HTRE-1 is described. Included are test results, calibration adjustments, and maintenance voltage charts. The prototype of this equipment was operated in the controls mockup. (auth)
U.S. Atomic Energy Commission depository collection.
Note:
DOE contract number: AT(11-1)-171 NSA number: NSA-16-024974 OSTI Identifier 4817359 Research organization: General Electric Co. Aircraft Nuclear Propulsion Dept., Cincinnati.