XENON TRANSIENT TEST. CORE 1, SEED 2. Test Results T-612081. Section 3.
- Published
- [Place of publication not identified] : [publisher not identified], 1961.
[Oak Ridge, Tennessee] : [U.S. Atomic Energy Commission], 1961. - Physical Description
- microopaque : positive ; 8 x 13 cm
- Summary
- CORE 1, SEED 2. Test Results T-612081. Section 3. (Duquesne Light Co., Shippingport, Penna.). First issue, Apr. 20, 1961. 28p. . The reactor was operated at full power to obtain equilibrium xenon concentration and then shutdown for 8 1/2 hr to obtain peak xenon concentration. It then was brought to 75 and then 67% of full power; the xenon concentration returned to an equilibrium value 4 hr after reactor startup. There was no apparent effect on the nuclear instrumentation caused by xenon concentration changes. Values of rod worth were determined, and operating characteristics during the test are given. (D.L.C.)
- Report Numbers
- DLCS-1560303
- Other Subject(s)
- Collection
- U.S. Atomic Energy Commission depository collection.
- Note
- NSA number: NSA-15-020391
OSTI Identifier 4073929
Research organization: Duquesne Light Co., Shippingport, PA (United States).
View MARC record | catkey: 39686814