A test was performed on the core flow instrumentation of the Shippingport Pressurized Water Reactor to determine and correct any calibration drift. Core flow, seed flow, and blanket flow differential pressure cells were calibrated in the operating rangs of 60 to 100% flow. (D.L.C.)