SYSTEMS PROGRAM MONTHLY PROGRESS REPORT FOR NOVEMBER 19b0. (Aerojet- General Nucleonics, San Ramon, Calif.). Dec. 30, 1960. 97p. Contract AT(lO- 1)-880. Underwater repairs to the GCRE were successfully completed, and full- power operstion with the 1B-2L core was achieved. Work continued on the preparation and review of operating procedures for the ML-1. Fabrication of the ML-1 package was continued. Gas corrosion tests are reported on Hastelloy-X and yttrium-modified Hastelloy-X. Final revision of a feasibility study for a dual- cycle power system was completed. (W.L.H.)