The design capacity of the Gurochemic reprocessing plant is examined. Predicted loads of materials to be processed are discussed along with other factors such as maintenance down-time. It was decided that 150 days per year of extractive operation should be scheduled to handle 100 tons of irradiated fuel. (J.R.D.)
U.S. Atomic Energy Commission depository collection.
Note
NSA number: NSA-13-016899 OSTI Identifier 4248007 Research organization: European Company for the Chemical Processing of Irradiated Fuels, Mol, Belgium.