PAR IN-PILE TEST LOOP. Design-Safety and Status Report. Revision 1.
- Author
- Weisman, J.
- Published
- United States : [publisher not identified], 1959.
[Oak Ridge, Tennessee] : [U.S. Atomic Energy Commission], 1959. - Physical Description
- microopaque : positive ; 8 x 13 cm
- Additional Creators
- Mayer, J. A., Repp, C. D., Ricks, L. O., Search, H. K., and Wicker, E. E.
- Summary
- In part A of this report the in-pile loops which PAR was to supply are described in detail. Part B describes the status of the PAR work at the time of termination of the project. All out-of-pile operating experience is presented together with a summary of the design and construction status. Detailed lists of all drawings used for the construction of the loop and equipment racks are provided. (W.L.H.)
- Report Numbers
- WCAP-910
- Other Subject(s)
- Collection
- U.S. Atomic Energy Commission depository collection.
- Note
- DOE contract number: W-7405-ENG-26; SUBCONTRACT NO. 1342
NSA number: NSA-13-008330
OSTI Identifier 4296500
Research organization: Pennsylvania Power and Light Co. Atomic Power Dept., Pittsburgh.
Research organization: Westinghouse Electric Corp. Atomic Power Dept., Pittsburgh.
View MARC record | catkey: 42521410