Catalog
Bookmarks
0
Course Reserves
My Account
Advanced search
Search in
Keyword
Title
Author/Creator
Subject
Browse by LC Call Number
Browse by Author
Browse by Subject
search for
Search
Search
Advanced search
Start Over
Actions for PERIODIC CALIBRATION OF REACTOR PLANT INSTRUMENTATION (PRESSURE, FLOW, LEVEL AND DIFFERENTIAL PRESSURE). CORE 1, SEED 4. Test Evaluation
Share
Email
RIS file
Bookmark
Report an Issue
PERIODIC CALIBRATION OF REACTOR PLANT INSTRUMENTATION (PRESSURE, FLOW, LEVEL AND DIFFERENTIAL PRESSURE). CORE 1, SEED 4. Test Evaluation
Published
United States : [publisher not identified], 1965.
[Oak Ridge, Tennessee] : [U.S. Atomic Energy Commission], 1965.
Physical Description
microfiche : negative ; 11 x 15 cm
Full Text available online
Availability
I Want It
I Want It
Finding items...
Report Numbers
DLCS-3430106
Other Subject(s)
Cleaning
Control systems
Coolant loops
Coolants
Errors
Fluid flow
Instruments
Measured values
Operation
Power and power-breeder reactors
Power plants
Pressure
Reactor technology
Reactors
Shippingport
Standards
Collection
U.S. Atomic Energy Commission depository collection.
Note
DOE contract number: AT(11-1)-292
NSA number: NSA-19-017271
OSTI Identifier 4660287
Research organization: Duquesne Light Co., Shippingport, Pa. Page(s): 8.
View MARC record
| catkey: 44538896