Response to the Cresap Test Center inspection and acceptance services report. Interim report No. 2.
- Published
- United States : [publisher not identified], 1978.
Springfield, Va. : National Technical Information Service, [approximately 1978] - Physical Description
- microfiche : negative ; 11 x 15 cm
- Summary
- This report summarizes the response of Fluor Engineers and Constructors, Inc. to the results of the Ralph M. Parsons Company acceptance-inspection services for the Department of Energy. The Parsons comments have been summarized by them in DOE Report Number FE-1234-8. The objective of Parsons work was to determine that the Cresap Test Center was reactivated in accordance with Fluor's drawings and specifications; that the facility would meet applicable codes; and that it is capable of being operated in a safe manner under the conditions defined by DOE and Fluor. Letter reports were issued by Parsons describing the results of their separate tasks of acceptance-inspection work. See DOE Report Number FE-1234-8 for more details. A review was made by Fluor of each Parsons letter, and a responding letter was sent to DOE and Parsons, as appropriate. Copies of these letters are contained in the Appendix and are summarized in Section 2 of this report.
- Report Numbers
- FE-1517-61
- Other Subject(s)
- Collection
- NTIS collection.
- Note
- DOE contract number: EX-76-C-01-1517
OSTI Identifier 5721607
Research organization: Fluor Engineers and Constructors, Inc., Irvine, CA (USA).