Operating history report for the Peach Bottom HTGR. Volume I. Reactor operating history
- Author
- Scheffel, W. J
- Published
- United States : [publisher not identified], 1976.
[Oak Ridge, Tennessee] : [U.S. Atomic Energy Commission], 1976. - Physical Description
- microfiche : negative ; 11 x 15 cm
- Additional Creators
- Baldwin, N. L. and Tomlin, R. W.
- Summary
- The operating history for the Peach Bottom-1 Reactor is presented for the years 1966 through 1975. Information concerning general chemistry data, general physics data, location of sensing elements in the primary helium circuit, and postirradiation examination and testing of reactor components is presented.
- Report Numbers
- GA-A-13907(Vol.1)
- Other Subject(s)
- 21 specific nuclear reactors and associated plants
- 210300 - power reactors, nonbreeding, graphite moderated
- Availability
- Enriched uranium reactors
- Gas cooled reactors
- Graphite moderated reactors
- Helium cooled reactors
- Htgr type reactors
- Maintenance
- Operation
- Peach bottom-1 reactor
- Performance
- Power generation
- Power reactors
- Reactor maintenance
- Reactor operation
- Reactors
- Thermal reactors
- Collection
- U.S. Atomic Energy Commission depository collection.
- Note
- DOE contract number: E(04-3)-0167-PRJ-56
OSTI Identifier 7136159
Research organization: General Atomics, San Diego, CA (United States).
View MARC record | catkey: 45371737