This quarter we have made considerable progress on the list of specific experimental runs to be performed contained in the last report on August 10. To be specific, 19 out of 28 on that list for the present matrix have been performed with no more than one condition different than shown on the list. The reason for this difference is that the loading of recovered heavy mediums on the matrix has very often been higher than we predicted on the basis of the earlier batch work. In addition, 37 runs have been made to assess machine performance, correct problems or explore new ideas.
DOE contract number: EX-76-A-01-2295-056 OSTI Identifier 6355183 Research organization: Massachusetts Inst. of Tech., Cambridge (USA). Francis Bitter National Magnet Lab.