A computer-controlled automatic control rod drive system (ACRDS) was designed and operated in EBR-II during reactor runs 121 and 122. The ACRDS was operated in a checkout mode during run 121 using a low worth control rod. During run 122 a high worth control rod was used to perform overpower transient tests as part of the LMFBR oxide fuels transient testing program. The testing program required an increase in power of 4 MW/s, a hold time of 12 minutes and a power decrease of 4 MW/s. During run 122, 13 power transients were performed.