Economic analysis indicates that at 10 per GJ for energy, total system savings in the fall 1979 and spring 1980 season totaled 33,340, which was 23% of the 143,600 construction cost.
DOE contract number: AC05-77ET20116 OSTI Identifier 5390053 Research organization: Rutgers-the State Univ., New Brunswick, NJ (USA). Dept. of Biological and Agricultural Engineering.